DEFEND GRANITE BAY
  • Home
  • About Us
  • Issues
    • Why Not Wineries?
    • Residential Re-zoning
    • A Senior Living Explosion?
    • Douglas Blvd Commercial Corridor
    • Treelake Storage Expansion
    • How to get involved...
    • More Links....
  • Donate
  • Events
  • Publications
  • Partners
  • Contact

Commercial Projects along Douglas Blvd

Traffic and parking are always the top two concerns. Setbacks and esthetics are important too.

We are not anti-development. We support APPROPRIATE development that fits within our General Plan, maintains the character and feel of our community, and that our local services are able to support.
Click here to see a map of planned/proposed/approved projects >>

Granite Bay Medical Offices

The project consists of two medical office buildings with 91 parking spaces on 2.13 acres at the north side of Douglas Boulevard, on the northwest corner of the intersection of Berg Street and Douglas Boulevard. Each of the two buildings would be 7,955 square feet.

Status:  On hold since June 2017 per Community Development.

History:  MAC did not recommend (6-0) on Oct. 5.

http://www.placer.ca.gov/departments/communitydevelopment/envcoordsvcs/ceqa-active-projects

The project proposes a General Plan Amendment to
change the land use designation from Rural Low Density Residential, .9 – 2.3 Acres per Dwelling Unit to Commercial; a rezone from RS-B-20 (Residential Single Family, Combining Minimum Building Site of 20,000 Square Feet) to OP-Dc (Office Professional, Combining Design Corridor); a Minor Boundary Line Adjustment so each building will be on its own lot; a Design Review to be approved at the staff-level; and a Variance to construct a 12-foot high retaining wall at the northwest corner where six feet is normally required.

Kally Kedinger-Cecil, Assistant Planner

Quarry Ridge Professional Office Park  

The Quarry Ridge Professional Office Park would include one 3,200 SQ. FT. office building, and three one-story medical offices (4,020 - 4,530 - AND 5,510 SQ. FT. respectively for a total of 17,260 SQ. FT.) and 91 parking stalls. The property is located on the northeast corner of the intersection of Douglas Boulevard and Berg Street.  

Status: EIR starting July 2017




Proposals/requests: General Plan Amendment and Re-Zone from low density residential to commercial and from RS-B-20 to OP-DC. Also, a 4 lot parcel map and a conditional use permit for an office park.

Kally Kedinger-Cecil, Assistant Planner

        


Local Places We Cherish...

Picture
Picture
Picture
Proudly powered by Weebly
  • Home
  • About Us
  • Issues
    • Why Not Wineries?
    • Residential Re-zoning
    • A Senior Living Explosion?
    • Douglas Blvd Commercial Corridor
    • Treelake Storage Expansion
    • How to get involved...
    • More Links....
  • Donate
  • Events
  • Publications
  • Partners
  • Contact